Media OutReach Newswire

2024-07-10 21:35

First Phosphate Confirms Longest High Grade Intersect to Date of 8.9% Igneous Phosphate Across 156 Metres from Surface at Its Begin-lamarche Project in Saguenay-Lac-St-Jean, Quebec, Canada

SAGUENAY, QUEBEC - Newsfile Corp. - 10 July 2024 - First Phosphate Corp. (CSE: PHOS) (OTC: FRSPF) (FSE: KD0) ("First Phosphate" or the "Company") is pleased to report results from another 11 drill holes at its Bégin-Lamarche project located in the Saguenay-Lac-St-Jean region of Quebec, Canada.



The Company's 25,929 m drill program was completed ahead of schedule on April 29, 2024. All samples have now been shipped to Actlabs, ON, for analyses. Shortly, a 43-101 resource estimate will be initiated followed immediately by a Preliminary Economic Assessment ("PEA"). Results of both studies are expected by end of fiscal Q4 2024.



Highlights:



  • Phosphate Mountain Zone:
    • Drill hole BL-24-92 intersected 8.13% P2O5 (phosphate) over 177.0 m starting at a surface depth of 15.0 m.
    • Drill hole BL-24-94 returned an intersection of 11.38% P2O5 over 99.0 m starting at a depth of 51.0 m including an interval of 14.56% P2O5 over 42.7 m starting at 89.0 m.
    • Drill hole BL-24-95 returned an intersection of 8.90% P2O5 over 156.0 m starting at a surface depth of 6.0 m.
  • Southern Zone:
    • Drill hole BL-24-88 intersected 7.18% P2O5 over 144.0 m from a depth of 261.0 m. This intersection is one of the highest phosphate concentrations in the Southern Zone.
    • Drill hole BL-24-89 intersected 5.99% P2O5 over 112.0 m starting at a depth of 233.0 m.
  • Northwestern Zone
    • Drill hole BL-24-91 intersected 7.63% P2O5 over 45.0 m starting from a depth of 84.0 m
"So far, we have intersected significant phosphate layers in all but 2 holes continuously across the 3 km magnetic trend at our Bégin-Lamarche project," said First Phosphate CEO, John Passalacqua. "We are dealing with a significant phosphate horizon to be quantified shortly by a 43-101 resource estimate followed immediately by a PEA."



Phosphate Mountain Zone



A total of 23 drill holes have been completed to date in the Phosphate Mountain Zone while results from 20 drill holes have been received to date. Data received from these 20 drill holes shows grades of over 10% P2O5 over widths ranging from 7 m to 99 m. The Phosphate Mountain Zone has been drilled for a total length of 250 m to date. This zone is beginning to merge (from the southwest) with the Northern Zone (See Figure 1) where a 500 m thick phosphate mineralized envelope exists, one which has delineated up to 5 individual layers ranging from 60 m to 100 m in thickness starting at surface and continuing down to a depth of 300 m. The overall strike length of the Phosphate Mountain Zone and the Northern Zone is approximately 600 m.



Drill hole BL-24-90 intersected 10.15% P2O5 (phosphate) over 84.0 m starting at a surface depth of 6.0 m. Drill hole BL-24-92 intersected 8.13% P2O5 (phosphate) over 177.0 m starting at a surface depth of 15.0 m. Within this intersection, three phosphate layers with grades over 10% were intersected. Drill hole BL-24-94 returned an intersection of 11.38% P2O5 over 99.0 m starting at a depth of 51.0 m including an interval of 14.56% P2O5 over 42.7 m starting at 89.0 m. Drill hole BL-24-95 returned an intersection of 8.90% P2O5 over 156.0 m starting at a surface depth of 6.0 m. (See Table 1).



Table 1 - Drill Results for the Phosphate Mountain Zone



Hole From (m) To (m) Length1 (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-85 102.0 134.0 32.0 11.54 4.28 25.80
BL-24-85 150.0 165.0 15.0 6.02 1.63 11.46
BL-24-90 6.0 90.0 84.0 10.15 2.82 21.43
including 6.0 35.0 29.0 10.95 3.09 26.07
including 54.0 90.0 36.0 12.29 3.23 21.60
BL-24-92 15.0 192.0 177.0 8.13 3.89 22.49
including 36.0 72.0 36.0 11.92 5.91 33.41
including 93.0 108.0 15.0 13.93 6.88 31.80
including 138.0 171.0 33.0 10.52 5.19 29.86
BL-24-94 51.0 150.0 99.0 11.38 3.98 25.37
including 5.0 27.0 22.0 9.62 5.14 29.73
including 89.0 131.7 42.7 14.56 4.52 26.11
BL-24-95 6.0 162.0 156.0 8.90 4.14 20.97
including 6.0 45.0 39.0 11.09 4.96 23.59
including 69.0 108.0 39.0 12.10 5.39 26.41
including 141.0 162.0 21.0 13.54 6.94 33.94
BL-24-98 18.0 33.0 15.0 4.62 2.24 12.74




1 Lengths are measured along the core. True widths are estimated to be between 70 and 90% of the core interval.



Southern Zone



The Southern Zone has been drilled at 100 m spaced sections over a strike length of 1,600 m. Results to date from the Southern Zone show continuous widths in excess of 100 m of phosphate mineralization.



Drill hole BL-24-88 intersected 7.18% P2O5 over 144.0 m from a depth of 261.0 m. This intersection is one of the highest phosphate concentrations in the Southern Zone. Drill hole BL-24-89 intersected 5.99% P2O5 over 112.0 m starting at a depth of 233.0 m. These results show that phosphate grades seem to increase with depth while widths remain over 100 m wide (see Table 2).



Table 2 - Drill Results for the Southern Zone



Hole From (m) To (m) Length1 (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-88 172.25 180.0 7.75 6.64 5.40 36.62
BL-24-88 219.0 363.0 144.0 7.18 4.61 31.02
including 261.0 307.6 46.6 8.89 5.25 34.84
BL-24-89 52.2 58.0 5.8 5.74 3.11 20.02
BL-24-89 128.7 141.0 12.3 4.65 2.83 16.20
BL-24-89 166.0 183.0 17.0 3.70 2.14 11.10
BL-24-89 195.7 199.0 3.3 7.64 5.17 28.45
BL-24-89 233.0 345.0 112.0 5.99 4.67 25.64
BL-24-93 132.0 349.4 217.4 4.92 4.08 21.90
including 324.0 349.4 25.4 7.44 4.95 28.33




1 Lengths are measured along the core. True width is estimated to be between 60% and 90% of the core interval.



Northwestern Zone



Drill hole BL-24-91 intersected 7.63% P2O5 over 45.0 m from a depth of 84.0 m and drill hole BL-24-99 intersected 7.25% P2O5 over 30.5 m starting at a depth of 92.0 m (See Table 3). These results show that the Northwestern zone has an average width of 40 m with grades between 7% and 9% P2O5.



Table 3 - Drill Results for the Northwestern Zone



Hole From (m) To (m) Length1 (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-91 84.0 129.0 45.0 7.63 4.05 24.55
BL-24-99 92.0 122.5 30.5 7.25 4.03 24.94




1 Lengths are measured along the core. True width is estimated to be over 80% of the core interval.



Summary



The technical parameters of the drill holes being released in this press release are shown in Table 4 below and their location is shown in Figure 1 below. A summary of the mineralized intersections from the 2024 drilling program is presented in Table 5.



Table 4 - Parameters for the Current Drill Holes Being Released



Hole_ID Easting Northing Azimuth Dip Length (m) Zone
BL-24-85 326970 5403759 330 -50 201 Mountain
BL-24-88 326227 5403246 125 -45 366 Southern
BL-24-89 325766 5401842 305 -45 366 Southern
BL-24-90 326884 5403904 150 -75 150 Mountain
BL-24-91 326231 5403247 330 -50 201 NW
BL-24-92 326874 5403806 150 -45 252 Mountain
BL-24-93 325558 5402120 125 -60 363 Southern
BL-24-94 326874 5403805 330 -70 225 Mountain
BL-24-95 326784 5403749 150 -45 162 Mountain
BL-24-98 326780 5403667 305 -45 246 Mountain
BL-24-99 326174 5403277 305 -80 252 NW




Table 5 - Other Previously Released Results for the 2024 Drill Campaign



Hole_ID From (m) To (m) Length (m) P2O5 (%) TiO2 (%) Fe2O3T (%)
BL-24-22 195.0 259.0 64.50 5.80 2.94 21.04
BL-24-23 21.0 175.1 154.1 7.02 4.40 27.34
BL-24-24 61.3 190.9 129.6 5.22 3.63 22.32
BL-24-25 74.2 117.0 42.8 9.89 3.54 28.65
BL-24-26 6.9 96.0 89.1 9.44 3.92 27.59
BL-24-27 138.0 189.0 51.0 4.41 3.05 20.62
BL-24-28 73.25 152.2 78.95 5.48 4.07 24.68
BL-24-29 99.0 276.0 177.0 4.46 3.63 22.85
BL-24-30 33.0 78.65 45.65 4.28 2.97 19.83
BL-24-31 119.85 213.8 93.95 7.16 3.49 18.76
BL-24-32 159.0 228.0 69.0 5.51 3.82 24.60
BL-24-33 3.8 110.0 106.2 5.00 3.70 21.19
BL-24-34 93.0 192.0 99.0 6.34 2.74 20.09
BL-24-35 212.5 253.7 41.2 6.25 3.44 19.55
BL-24-36 234.0 342.0 108.0 6.83 4.33 28.34
BL-24-37 84.0 126.0 42.0 6.03 4.47 28.57
BL-24-39 102.0 150.0 48.0 5.51 2.20 16.64
BL-24-40 186.0 274.2 88.2 7.76 2.86 21.87
BL-24-41 96.0 141.0 45.0 5.18 3.08 17.68
BL-24-42 6.6 188.7 182.1 5.04 3.09 17.77
BL-24-43 111.0 369.0 258.0 5.41 4.33 22.19
BL-24-44 192.4 283.0 90.6 7.48 3.38 23.64
BL-24-45 22.0 60.0 38.0 7.97 3.15 20.54
BL-24-46 155.2 177.6 22.4 14.33 5.83 28.28
BL-24-47 153.0 304.0 151.0 3.89 3.36 19.51
BL-24-48 32.0 39.65 7.65 15.01 2.59 19.17
BL-24-49 72.5 105.5 33.0 8.65 3.77 24.05
BL-24-50 4.2 93.0 88.8 5.90 4.14 23.62
BL-24-51 70.0 111.0 41.0 7.72 1.88 16.09
BL-24-52 204.0 247.7 43.7 7.04 3.62 24.50
BL-24-53 70.1 132.4 62.3 9.50 4.12 28.45
BL-24-53 154.1 246.0 91.9 6.92 3.50 20.08
BL-24-54 61.1 101.1 40.0 9.18 4.80 28.16
BL-24-55 4.0 194.8 190.8 4.60 3.64 19.83
BL-24-56 6.5 99.0 92.5 11.82 5.29 30.96
BL-24-56 123.0 162.0 39.0 8.43 3.18 17.56
BL-24-57 183.9 194.0 10.1 6.58 3.86 22.58
BL-24-58 81.0 144.0 63.0 4.02 3.46 18.82
BL-24-59 6.55 59.4 52.85 12.44 5.65 33.60
BL-24-60 3.7 197.7 194.0 5.21 3.81 22.50
BL-24-61 No significant results
BL-24-62 69.0 144.65 75.65 9.97 3.66 20.71
BL-24-63 37.7 297.0 259.3 5.21 3.80 21.65
BL-24-64 3.0 42.0 39.0 9.06 4.11 25.45
BL-24-65 144.7 162.5 17.8 10.37 5.40 31.00
BL-24-66 6.0 97.0 91.0 5.35 4.43 26.85
BL-24-67 3.0 87.0 84.0 11.85 5.09 32.49
BL-24-68 13.0 46.65 33.65 5.64 4.02 22.83
BL-24-69 29.0 65.1 36.1 9.81 3.26 22.36
BL-24-70 73.6 148.0 74.4 4.27 3.49 20.55
BL-24-71 73.3 174.9 101.6 4.76 3.52 19.60
BL-24-72 196.0 305.0 109.0 4.72 3.70 21.26
BL-24-73 195.2 366.0 170.8 5.23 4.13 22.38
BL-24-74 82.0 102.3 20.3 10.30 4.28 19.01
BL-24-75 118.2 135.0 16.8 6.01 4.34 26.65
BL-24-76 49.0 64.25 15.3 11.27 4.40 24.29
BL-24-77 174.0 360.0 186.0 4.53 3.23 19.64
BL-24-79 No significant results
BL-24-78 47.55 102.7 55.15 8.72 3.18 19.87
BL-24-80 2.4 74.55 72.15 6.59 2.37 16.23
BL-24-81 190.15 265.3 75.15 5.05 3.61 20.30
BL-24-82 6.0 83.7 77.7 11.07 3.28 18.63
BL-24-83 5.0 216.6 211.6 5.81 3.52 24.00
BL-24-84 205.9 283.0 77.1 8.41 4.14 22.75
BL-24-86 9.3 44.55 35.25 6.24 4.46 23.61
BL-24-87 173.6 198.0 24.4 7.12 5.57 28.79




Detailed results from the 2024 drill program are available at:



May 14, 2024: https://firstphosphate.com/May_14_2024
April 23, 2024: https://firstphosphate.com/April_23_2024
April 2, 2024: https://firstphosphate.com/drilling-2m-vein-of-massive-apatite
March 19, 2024: https://firstphosphate.com/initial-assay-results



Results for the earlier 4,661 m drill program conducted in 2023 can be found in the June 5, 2023 press release available at: https://firstphosphate.com/begin-lamarche-2023







Figure 1 - Drill Map for the 2024 Drill Program at Bégin-Lamarche



To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8917/216044_2e8d303324111add_001full.jpg



Quality Assurance / Quality Control



The sampling of, and assay data from, the drill core is monitored through the Company's implementation of a quality assurance - quality control (QA-QC) program designed to the CIM Mineral Exploration Best Practices Guidelines.



A formal chain-of-custody procedure was adopted for security of samples until their delivery at the laboratory. Drill core (NQ size) is logged and samples are selected by Laurentia Exploration Inc. geologists and sawn in half with a diamond saw at the project site. Half of the core is retained at the site for reference purposes. Sample intervals may vary from 0.5 to 3 metres in length depending on the geological observations. A blank and a standard are inserted at the beginning of each sample batch, usually one complete hole, and a blank and a standard are then inserted alternatively each 10 samples. Half-core samples are packaged and sent by ground transportation in sealed rice bags to an independent laboratory, Activation Laboratories Ltd. of Ancaster, Ontario (ISO/IEC 17025:2005 with CAN-P-1579). The core samples are crushed up to 80% passing 2mm (10 mesh), riffle split 250 g and pulverized (mild steel) to 95% passing -200 mesh. Each sample is analyzed for whole rock analysis (code 4B) for 10 major oxides and 7 trace elements by lithium metaborate/tetraborate fusion of 3g of material and analyze by ICP-OES. The laboratory has its own QA/QC protocols.



Qualified Person



The scientific and technical disclosure for First Phosphate included in this news release has been reviewed and approved by Gilles Laverdière, P.Geo. Mr. Laverdière is Chief Geologist of First Phosphate and a Qualified Person under National Instrument 43-101 - Standards of Disclosure of Mineral Projects ("NI 43-101").



Purchase of Additional Mineral Claims for Shares



First Phosphate has entered into a mineral claims purchase agreement with arm's length parties to acquire 15 additional mineral claims within the Bégin-Lamarche claim block in the area of the Saguenay-Lac-Saint-Jean, Quebec. The effective closing date of the transaction is July 10, 2024 and compensation is to be satisfied through the issuance of 200,000 common shares of the Company (the "Shares") at a deemed price of $0.20 per Share. These Shares will be subject to a statutory four month and one day hold period from closing of the transaction as well as an additional escrow period of 24 months from the closing date. The newly acquired claims are free from any royalty.



Stock Options



The Company has approved the grant of 150,000 stock options to purchase common shares of the Company (the "Options") to an eligible person of the Company, at an exercise price of $0.40 per share, with an expiry date of three years from the date of issuance. The Options vest in 4 tranches (25% on December 31, 2024, June 30, 2025, December 31, 2025 and June 30, 2026). The terms of the Options granted are in accordance with the Company's stock option plan approved by shareholders of the Company on August 25, 2023. All securities issued are subject to a statutory hold period of four months plus one day from the date of issuance, in accordance with applicable securities legislation.



Restricted Share Units ("RSUs")



The Company has also granted 175,000 RSUs of the Company ("RSUs") to an eligible consultant of the Company. The RSUs vest in 3 tranches (14% on August 31, 2024, and 43% on both November 30, 2024 and February 28, 2025). The RSUs are subject to the terms of the Company's Omnibus Equity Incentive Plan as approved by disinterested shareholders at the Company's annual and special meeting of shareholders held on August 25, 2023. All securities issued are subject to a hold period of four months plus one day from the date of issuance.



About First Phosphate Corp.



First Phosphate is a mineral development company fully dedicated to extracting and purifying phosphate for the production of cathode active material ("CAM") for the lithium iron phosphate ("LFP") battery industry. First Phosphate is committed to producing at high purity level, at full ESG standard and with low anticipated carbon footprint. First Phosphate plans to vertically integrate from mine source directly into the supply chains of major North American LFP battery producers that require battery grade LFP CAM emanating from a consistent and secure supply source. First Phosphate holds over 1,500 sq. km of royalty-free district-scale land claims in the Saguenay-Lac-St-Jean Region of Quebec, Canada that it is actively developing. First Phosphate properties consist of rare anorthosite igneous phosphate rock that generally yields high purity phosphate material devoid of high concentrations of harmful elements.



-30-



For additional information, please contact:



Bennett Kurtz, CFO
bennett@firstphosphate.com
Tel: +1 (416) 200-0657



Investor Relations: investor@firstphosphate.com
Media Relations: media@firstphosphate.com
Website: www.FirstPhosphate.com



Follow First Phosphate:



Twitter: https://twitter.com/FirstPhosphate
LinkedIn: https://www.linkedin.com/company/first-phosphate/



Forward-Looking Information and Cautionary Statements



This news release contains certain statements and information that may be considered "forward-looking statements" and "forward looking information" within the meaning of applicable securities laws. In some cases, but not necessarily in all cases, forward-looking statements and forward-looking information can be identified by the use of forward-looking terminology such as "plans", "targets", "expects" or "does not expect", "is expected", "an opportunity exists", "is positioned", "estimates", "intends", "assumes", "anticipates" or "does not anticipate" or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might", "will" or "will be taken", "occur" or "be achieved" and other similar expressions. In addition, statements in this news release that are not historical facts are forward looking statements, including, among other things, the Company's planned exploration and production activities, the properties and composition of any extracted phosphate, the Company's plans for vertical integration into North American supply chains, statements relating to the Company's planned exploration activities, including its drill target strategy and next steps for the Bégin-Lamarche Property; and the Company's interpretations and expectations about the results on the Bégin-Lamarche Property.



These statements and other forward-looking information are based on assumptions and estimates that the Company believes are appropriate and reasonable in the circumstances, including, without limitation, expectations of the Company's long term business outcomes given its short operating history; expectations regarding revenue, expenses and operations; the Company having sufficient working capital and ability to secure additional funding necessary for the exploration of the Company's property interests; expectations regarding the potential mineralization, geological merit and economic feasibility of the Company's projects; expectations regarding drill programs and the potential impacts successful drill programs could have on the life of the mine and the Company; mineral exploration and exploration program cost estimates; expectations regarding any environmental issues that may affect planned or future exploration programs and the potential impact of complying with existing and proposed environmental laws and regulations; receipt and timing of exploration and exploitation permits and other third-party approvals; government regulation of mineral exploration and development operations; expectations regarding any social or local community issues that may affect planned or future exploration and development programs; expectations surrounding global economic trends and technological advancements; and key personnel continuing their employment with the Company.



There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include: limited operating history; high risk of business failure; no profits or significant revenues; limited resources; negative cash flow from operations and dependence on third-party financing; the uncertainty of additional funding; no dividends; risks related to possible fluctuations in revenues and results; insurance and uninsured risks; litigation; reliance on management and key personnel; conflicts of interest; access to supplies and materials; dangers of mineral exploration and related liability and damages; risks relating to health and safety; government regulation and legal uncertainties; the company's exploration and development properties may not be successful and are highly speculative in nature; dependence on outside parties; title to some of the Company's mineral properties may be challenged or defective; Aboriginal title and land claims; obtaining and renewing licenses and permits; environmental and other regulatory risks may adversely affect the company; risks relating to climate change; risks related to infrastructure; land reclamation requirements may be burdensome; current global financial conditions; fluctuation in commodity prices; dilution; future sales by existing shareholders could cause the Company's share price to fall; fluctuation and volatility in stock exchange prices; and risks related to market demands. There can be no assurance that any opportunity will be successful, commercially viable, completed on time or on budget, or will generate any meaningful revenues, savings or earnings, as the case may be, for the Company. In addition, the Company will incur costs in pursuing any particular opportunity, which may be significant.



These factors and assumptions are not intended to represent a complete list of the factors and assumptions that could affect the Company and, though they should be considered carefully, should be considered in conjunction with the risk factors described in the Company's other documents filed with the Canadian securities authorities, including without limitation the "Risk Factors" section of the Company's Annual Information Form dated November 29, 2023 which is available on SEDAR at www.sedarplus.ca. Although the Company has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking information or information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

發佈者對本公告的內容承擔全部責任

source: First Phosphate Corp.

【你點睇?】2024年國際外交上,誰是最大贏家?誰是最大輸家?► 立即投票

人氣文章
最近7天
1
高息定存 | 工銀亞洲推3個月5厘息搶新客,招商永隆推快閃優惠
2
神州經脈 | PMI遜預期,滬指全年止跌回升,人幣年度貶幅擴
3
神州經脈 | 換手機可獲政府補貼,政策利率將降,滬指周挫逾5%
4
【FOCUS】零售寒冬襲京滬港,逆市奇葩值借鏡
5
內銀股 | 人行再提擇機減息降準,內銀獲中金唱好,應該點部署?
6
回顧展望-A股自強 | 憧憬國策利好,機構對明年股市走勢樂觀
7
回顧展望-人幣走貶 | 關稅殺到,先貶為敬,人幣明年勢見7.5
8
港股 | 蕭猷華:恒指春節前目標21500點
9
高息定存 | 一周高息合集,恒生1個月定存4厘,工銀亞洲3個月最高5厘
10
易經看世界 | 從乙巳年立春八字看香港前景:哪行業當旺?哪行業運滯?(有片)
1
高息定存 | 一周高息合集,大新3個月最高4.1厘,華僑及信銀國際見4厘
2
高息定存 | 滙豐3個月港元存息高達3.8厘,6個月3.55厘
3
高息定存 | 銀行高息搶存,東亞上調3個月定存息至3.9厘,花旗加至3.7厘
4
高息定存 | 建行亞洲上調3個月存息至3.85厘,富邦3.8厘
5
港股 | 蕭猷華:關注中央經濟工作會議,美團股價落後
6
高息定存 | 華僑銀行208日定存年息高達3.8厘
7
基建債券 | 認購額178.5億首未足額,發言人:受減息步伐影響
8
神州經脈 | 政治局會議定調明年貨幣政策適度寬鬆,CPI遜預期
9
詹培忠父子涉隱瞞秘密「買殼」串謀欺詐罪成
10
神州經脈 | 11月進出口數據降溫,貨幣政策轉向股匯齊漲
11
專訪|林本利系列專訪逢周五登場,股市篇:勿驚美股調整,港股那些可以放心買那些勿沾手(有片)
12
專訪|林本利系列專訪一連三個周五登場,樓市篇:中原指數長線重返180,買樓勿買新樓(有片)
13
特首述職|習近平讚揚李家超務實進取,中央全力支持帶領各界改革
14
滙控 | 擬推改革削減成本,股價再創17年新高,聖誕鐘真係要買滙豐?
15
利率波動難測 如何以債券策略爭取「財息兼收」?
16
神州經脈 | 特別國債或發3萬億,滬指逼近三千四,日外相訪華
17
高息定存 | 工銀亞洲推3個月5厘息搶新客,招商永隆推快閃優惠
18
高息定存 | 一周高息合集,華僑1個月定存4厘208日3.8厘
19
中經會 | 明年提高財政赤字率,適時降準降息,穩住樓市股市
20
資源有限窒礙中小企轉型? 營商生態圈助你開拓無限商機!
21
居屋2024 | 新一期居屋攪珠結果出爐,預計最快明年第二季揀樓
22
2025年環球經濟與輪證投資前瞻
23
高息定存 | 信銀國際上調1個月定存年息至高達3.88厘
24
神州經脈 | 工業利潤降幅收窄,低空經濟發展司成立,滬指全周升
25
基建債券 | 基建債券認購100手或以下獲全額配發
26
回顧展望-共渡時艱 | 表列機構對今明年本港經濟增長預測
27
【穩醣趨勢: 揀無糖飲品、原型食物,戒澱粉質係咪就得? 】
28
【FOCUS】個人養老金制度升級,一石二鳥未改挑戰
29
高息定存 | 聖誕前夕銀行加存息吸資金,大眾3個月加至3.6厘
30
【FOCUS】「無厘頭」減息釀驚嚇,長債失控顯聯儲失信譽
專業版
HV2
精裝版
SV2
串流版
IQ 登入
強化版
TQ
強化版
MQ

【etnet 30周年】多重慶祝活動一浪接一浪,好禮連環賞!

【etnet30周年連環賞】睇住賞Moon-River RELOVE 蛋白酵素去漬抑菌手洗精 (價值HK$188)

etnet榮獲HKEX Awards 2023 「最佳證券數據供應商」大獎

貨幣攻略

大國博弈

說說心理話

聖誕新年特輯

Watch Trends 2024

北上食買玩

Art Month 2024

秋天養生食療

消委會報告

山今養生智慧

輕鬆護老